How it works
Four steps. The first is free.
The report is allowed to say no. That's what makes a yes worth something.

Sixty seconds
- The two-minute form
- What we check before the report goes out
- The site visit, and when you can say stop
Send the address
Two minutes on the form. The property, the project, how to reach you.
We check your lot
Zoning, setbacks, flood, slope, utilities. Public records, no visit.
Your report arrives
Four pages within the hour. If anything's unclear, a person looks first.
You decide
We reach out once. Want more? A project manager walks the lot. Want to stop? We stop.
Only if you choose: design, price, build
A fixed-price proposal after design. Seven to fourteen months to move-in.
If a Realtor sent you
Their name is on the report. If you build, their brokerage is paid a referral fee — never the agent personally. You sign a disclosure first; your price doesn't change; you may use any builder.
If you found us yourself
Same report, same answer. No agent needed.